Location: home >>How to install the rotary dryer Carrier roller and tranmission parts

    Welcome to HongRun MACHINE

Roller part installation

Idlers installation point is based on the fixed idler embedded iron base linked to the foundation, it is necessary to determine whether the two
symmetrical roller stand, if it is determined to be welded symmetrical.

Idler roller above the base of the angular distance generally, the roll center circle of 60 ° apart, 60 ° angle is the best hold points, can reduce the
friction resistance. Auxiliary operation to achieve better functionality.




 
Transmission part installation:

Transmission installation point is: Note the ring gear and pinion intersection soon, need to be combined according to affinity lines, in order to 
avoid situations card teeth. The center of the ring gear, transmission parts center and the ring gear pinion angle X-ray into a 40 ° angle for the
 best transmission.


Transmission parts reducer and coupling parts maintenance is essential, often need to check the internal gear oils are empty, so as to avoid the 
lack of oil while the gear reducer damage, couplingshttp://www.cngxdryer.com/Product/Drum_Dryer/Sawdust_Dryer.html must submit (Transmission part installation and commissioning) to check whether there is 
damage nylon rod couplings or whether there card bit happen.






contact:
Whatsapp:008613592505674
Email:sales@hwdcrusher.com

 
    Your Contact Details To Us    
(*)Required information
  •     Agree with this Privacy Policy
WhatsApp:008613592505674
Email:sales@hwdcrusher.com